Bridge Final Project
Prepare
Prepare
Set Up Your Work
Cardboard
Parchment
Blue Tape
Paper Cup
Hot Glue
Do Not Forget To...
HOT GLUE your paper cup
Tape Your Team Photos to your card baord
CORRECT
CORRECT
WRONG
WRONG
Use the blueprint to line up your cuts
Use the blueprint to line up your cuts
Use the RULER to mark your cuts
Use the RULER to mark your cuts
Your marks should look like this!
Your marks should look like this!
Your first pin should be at an angle.
Your first pin should be at an angle.
Push the second pin straight down.
Push the second pin straight down.
The pins will hold your work in place while the glue dries.
The pins will hold your work in place while the glue dries.
Wrap up your loose wood.
Wrap up your loose wood.
Tape it down so NO ONE TAKES IT!
Tape it down so NO ONE TAKES IT!
Grading Rubric:
Grading Rubric:
50pts Completed Bridge.
Bridge sides (30pts)
Bridge complete with top and bottom (20pts)
30pts Bridge is Tested.
Bridge is stress tested
20pts Competition.
Students bridge receives points based on max capicity held compared to team in all other classes.